◆Constrcution method:Erecting both cross beam and viaduct segment
◆Max. hanging load:
Max. cross beam weight: max.length 51.5m, 710ton of 16pcs (weight exclude hangings)
Max. full span weight:40m span, 700ton of 16pcs (weight exclude hangings)
◆Max. Launching Span:≤40m
◆Max. segment weight:Cross beam: 60t max. segment: 100t
◆Feeding method:
Cross beam: Feeding from bottom only
Segment: feeding from bottom, front and rear
◆LG moving speed:longitudinal 0-1m/min, transverse 0-1m/min
◆Winch trolley:Rate capacity 100t(exclude lifting spreader)/ lifting height 45m under pulley
◆Winch trolle speed:hoisting 0-2.7m/min(load); travel speed 0-10m/min(load)
◆Winch trolley transverse shift:±500 mm
◆Lifting spreader:±180° Rotating ,slope adjustment: transverse ±5%, longitudinal ±5%
◆Service crane:10t
◆Construction cycle time:13-15days/span
◆Total power:175kW
◆Total weight:635t